With a total area of 11,000 m², the Waste Island project in Saudi Arabia involved the construction of two steel warehouses, each equipped with a 32-ton moving crane, requiring advanced structural analysis for stability and performance.
Services provided:
-
Structural design for steel warehouses
- Seismic and wind analysis
- Shop drawings
-
Calculation notes
Specialties:
-
Integration of a 32-ton moving crane
-
Optimization for seismic and wind resistance
Completed in collaboration with engineer Nadim Abdelnour, PhD.
Take it to the next level
Benefit from the latest advancements in structural design, combining cutting-edge technology, innovation, and performance. This state-of-the-art approach ensures optimized structures with maximum durability, enhanced strength, and unparalleled efficiency.