With a total area of 35,000 m², the Kempinski Hotel project in Brazzaville, Congo, required structural optimization to enhance efficiency and cost-effectiveness.
Services provided:
- Structural redesign
- Value engineering
- Structural shop drawings
- Planning
Specialties:
- Advanced structural modeling
- Optimization
- Conversion of a 30 cm post-tensioned slab into a 30 cm bidirectional hollow block slab
Completed in collaboration with GIE.