Florcon


 With a total area of 8,000 m², the Cimenterie Nationale project in Chekka, Lebanon, involved the construction of a steel warehouse and a 25-meter-high elevated steel water tank, requiring advanced structural analysis.

Services provided:

  • Reinforced concrete basement and steel warehouse design
  • Seismic and wind analysis
  • Shop drawings
  • Calculation notes

Specialties:

  • Structural design for industrial facilities
  • Elevated steel water tank (25m high)
  • Optimization for seismic and wind resistance

Completed in collaboration with engineer Nadim Abdelnour, PhD.